1. <blockquote id="ebtrd"></blockquote>
      1. <ruby id="ebtrd"></ruby>

        <var id="ebtrd"></var>

        <blockquote id="ebtrd"><i id="ebtrd"><optgroup id="ebtrd"></optgroup></i></blockquote>

        <blockquote id="ebtrd"><p id="ebtrd"></p></blockquote>
        <blockquote id="ebtrd"></blockquote>
        亚洲AV成人一区二区三区在线,人妻?综合?无码?另类,狠狠做深爱婷婷久久综合一区,无码综合网,久久久久久无码人妻中文字幕,欧洲AV在线,H色无码网站,亚洲精品666
        Hotline:400-880-1556

        English




        [Focus] Requirements and content of the new version of IEC 62619:2022, the energy storage battery standard

        Author:中認聯科 time:2022-08-09 Ctr:2928

        IEC Battery Technical Committee TC 21/SC 21A published the second edition of IEC 62619:2022 on 24 May 2022. Compared with the 2017 version, the detailed changes in the new version are shown in the table below. For changes to the new version, manufacturers need to pay special attention to the following changes, which need to be considered in the early design and development process:

        1. New requirements for moving parts;

        2. Additional hazardous live parts requirements;

        3. Additional battery system design requirements;

        4. Added system lock requirements;

        5. New EMC requirements;

        6. Additional laser triggers the spreading process.

        What's new in the new version

        新版新增.png 

        Modified content of the new version

        新版修改.png 

        The new version deletes the content

        新版刪除.png 

        Laser Triggered Spreading Process

        1. Cell preparation test

        (1) Fully charge the battery according to the method specified by the manufacturer

        (2) Place a thermocouple on the surface of the cell

        (3) Fixed cell

        (4) Determine the laser irradiation plan

        (5) Prepare equipment such as cell temperature measurement

        (6) Set the ambient temperature to 25℃±5℃

        (7) Irradiate the battery with a laser at a certain point and measure the temperature of the battery until the end of the observation

        (8) Turn off the laser when it is observed that the temperature rises rapidly due to the thermal runaway of the cell

        (9) Continue to observe the cell temperature and appearance until the temperature drops to a safe operating range

        (10) View temperature curve to confirm thermal runaway

        (11) The cell prediction shall be repeated 3 times, and if thermal runaway is confirmed in each test under the same conditions, the battery system spread test shall be carried out under the same irradiation conditions

        2. Battery system test

        (1) Fully charge the battery system according to the manufacturer's recommended conditions

        (2) Place a thermocouple on the surface of the cell

        (3) Fix the battery system on the test bench, and the irradiation point on the target cell should be the same or similar to that of the preliminary test

        (4) Prepare and set up equipment for battery system temperature test etc.

        (5) Determine the laser irradiation plan

        (6) Set the ambient temperature to 25 ℃ ± 5 ℃

        (7) Irradiate the target cell with a laser at a certain point and continuously measure the temperature of the monitored cell

        (8) When it is observed that the temperature rises rapidly due to the thermal runaway of the cell, turn off the laser

        (9) Observe and measure the cell temperature and the appearance of the battery system for at least 1 hour

        Warm Tips

        IEC 62619 is a safety standard for lithium secondary batteries used in industrial products. It is cited by power storage systems in many countries and regions and is the basic standard for battery systems in power storage system certification. If you want to know more about the requirements for battery product testing and certification or have battery products that need to be tested and certified, please feel free to contact us, our engineers will serve you as soon as possible!

        Related Articles
        • Wireless router for export to Canada must have ISED IC certification: Comprehensive analysis

        • Smart door locks are entering Canada. Why is ISED IC certification so crucial?

        • Smartphone ISED Certification: A Compliance Guide for Entering the Canadian Market

        • 3D printers to be exported to South Korea? Please keep the KC certification and customs clearance guide handy

        Follow Us
        主站蜘蛛池模板: 26uuu欧美日本| 欧美色资源站| 色伊人综合| 精品福利视频一区二区三区| 精品乱码一区二区三四区视频| 日本人妻伦在线中文字幕| 伊人色色| 亚洲色偷偷色噜噜狠狠99 | 放荡的少妇2欧美版| 国产精品毛片一区视频播| 韩国无码一区| 黄色不卡| 花蝴蝶日本高清免费观看| AV最新高清无码专区| 豆国产97在线 | 亚洲| 黄色日韩欧美视频免费在线观看| 国产精品自在线拍国产手青青机版| 极品粉嫩嫩模大尺度无码视频| 色婷婷婷丁香亚洲综合| 91精品人妻一区二区三区蜜桃| 国产成人久久精品一区二区| 亚洲午夜久久久久中文字幕 | 伊人偷拍| 亚洲熟妇夜夜一区二区三区| 亚洲av影片一区二区三区| 亚洲激情av| 最近中文国语字幕在线播放| 日本高清一区| 卢氏县| 大桥未久亚洲无AV码在线| 人妻影音先锋啪啪AV资源| 97se亚洲精品一区| 男人的天堂在线视频| 久久96热在精品国产高清| 久色导航| 欧美国产视频| 亚洲自偷自拍另类第1页| 日韩亚洲精品一卡二卡| 亚洲欧美成人精品香蕉网| 亚洲在线一区二区| 亚洲精品97福利在线|